Client:
Subconsultant to Mid Coast Transit Constructors (Stacy & Witbeck/Herzog/Skanska JV)
Name of Project & Location:
SANDAG Mid Coast Transit Corridor, San Diego CA
Construction Value:
$2 Billion
TSG Role:
Construction Management / Contract Compliance
TSG Value Add:
TSG’s control on the input of as-built and drawing updates ensures MCTC always has the most current drawings in a single location and available to all staff. This prevents design delays in the field and ensures the team is building off the most updated set. We are also improving the MCTC closeout schedule and saving engineering manhours on the back end of the project by keeping open submittal packages. This allows the JV to reduce engineering staff on an expedited schedule.